The rehabilitation of the landscape area was completed during the years 2018-19. The backbone of the park is a large stream, which is spanned by four new foot and bicycle bridges - two completely made of monolithic concrete, and two concrete ones with wooden decking. The water level of the stream is accessible via so-called water staircases. The road network and lighting are entirely new. The construction also includes three new playgrounds and a fitness trail. Additionally, in the southern part of the area, a so-called path in the crowns has been installed on the trees, which offers movement between rope obstacles. It is a suspended walkway led through the trees between two wooden towers.
Jakub Chvojka
The English translation is powered by AI tool. Switch to Czech to view the original text source.