Metropol Parasol

Metropol Parasol
Architect: Jürgen Mayer H.
Address: Plaza de La Encarnacion 1, Sevilla, Spain
Investor:Ayuntamiento de Sevilla, SACYR
Contest:2004
Project:2004-05
Completion:2007 - 27.03.2011
Area:12670 m2
Built Up Area:5000 m2
Site Area:18000 m2
Price:90 000 000 Euro


“Metropol Parasol” is a new landmark of the city of Seville – a place of identification and presentation of Seville’s role as one of the most fascinating cultural places in Spain. 
”Metropol Parasol” offers the potential to make the Plaza de la Encarnación into a new contemporary urban center. The role of this unique urban space in the center of the dense structure of the medieval old town of Seville provides a wide variety of differentiated activities, from the presentation of local history to recreation and shopping. The well developed infrastructure makes the place very alive as a destination for tourists and for citizens of the city. 
The concept of “Metropol Parasol” with the large mushroom-like structures in the basement houses an archaeological museum, an indoor market place at street level, an elevated plaza for events, a bar, restaurants and a panoramic tour on top of the Parasols. The polyurethane-coated timber structure grows out of the level of the archaeological excavation as a logo for the city. The multi-functional range of uses of the “Metropol Parasol” initiates a dynamic development of cultural and commercial facilities in the heart of Seville.
More than 3000 free-formed timber elements with different height and variable width 
The timber mega-structure of the Metropol Parasol is about 150 m long, 75m wide and 28m high. It consists of laminated veneer lumber Kerto-Q panels which are arranged on an orthogonal grid of 1.50 m x 1.50 m. The height of the free-formed timber elements is depends on the structural loading. At the less loaded perimeter it is ca. 30 cm and rises to about 3.00 m at the transition to the trunks. The variation of the structural thickness is the result of an iterative, static computer simulation (see below) and ranges between 7cm and 22cm, depending on the particular loads. 
The orthogonal timber structure is stiffened by steel diagonals, which are located mainly underneath the walkways. The structure of the Metropol Parasol therefore works as a rigid bi-directional timber lattice shell. 
The more than 3000 different wood elements are made in Aichach near Munich in Germany, and together for a total volume of 2500 m³ laminated veneer lumber.
New timber protection concept with polyurethane coating The timber structure has no roof and therefore must be protected from the weather. For this, the architects developed a new system for the timber preservation: the timber is directly coated with a waterproof but vapor-permeable 2-3mm thick 2-component polyurethane coating. Together with a colored top coat, this results in a new, up to now unknown protection for timber surface. 

Innovative special bonding for the structural connection detail 
Crucial for the behavior of the Metropol Parasol are the more than 3000 connection nodes at the intersections of the timber elements. Engineers at Arup and FFM developed an innovative connection detail based on glued-in steel bars, which at the same time are optimized for rapid erection on site. A thermal computer analysis by Arup revealed that the hot climate of southern Spain would be a particular challenge for the connection detail – a result that the thermal simulation and testing at the Fraunhofer Institut confirmed. The engineers at Arup and FFM then developed a new bonding process, especially for use in hot Seville. This development was supported by the WEVO-Chemie and the glue specialist Borimir Radovic. Experiments carried out on the connection detail at the University of Augsburg and the University of Stuttgart confirmed the proposed design.
Continuous electronic data transfer
The project Metropol Parasol was only conceivable as a result of an integrated design team of architects, structural engineers, building services, fire prevention specialist and the timber contractors. Prerequisite for the planning here was the complete electronic data exchange between all planning partners, including the general contractor, in all locations in Germany and Spain. The data from the architect model (JMH) could be integrated directly into the programs of the structural engineers (Arup) and the timber contractor (FFM) and then electronically processed.
Automated iterative structural analysis The geometric data for the 3D architectural model is the input data for the structural analysis. Using a specially written software tool these data are extracted and then processed using the in-house computer program of the structural engineer. The structural calculation itself requires a highly complex, 3D finite element analysis. Here the structural engineers at Arup developed an automated iteration tool with which the thickness of each timber element can be determined and optimised at each intersection of the structure. All relevant data are automatically read out from the structural analysis and forwarded electronically to the timber contractors and architects. 

Computer aided manufacturing process The data from the architectural model (JMH) are finally integrated with the data of the structural engineer (Arup) in the 3D model of the timber contractor (FFM) and combined with additional data from the production and detailed planning. The final results are specifications for the detailed design by external engineers (IB Harrer) and, after a similarly iterative process, data for the manufacturing process. The free-formed pre-defined curved shapes of the timber panels are cut by a computer-controlled robot from large rectangular panels, and glued together from single thin veneer plywood, optimised so as to minimise cut loss. Any detail adjustments and pre-assembly of the connection elements for the subsequent details of the elements are carried out in Germany before the 3000 elements are sent by truck to southern Spain. There the elements are PU coated on site by a local company before they are delivered to Finnforest Merk on site for erection according to the established method.
2 comments
add comment
Subject
Author
Date
veřejný prostor
Vích
12.08.11 11:29
je to úžasné, fantastické!
klamm
15.08.11 09:27
show all comments

more buildings from Jürgen Mayer H.