Reconstruction of the administrative building of the company Milos

Reconstruction of the administrative building of the company Milos
Investor:Milos s.r.o.
Project:2003-04
Completion:2004-05
Area:2344 m2
Built Up Area:973 m2
Built Up Space:11489 m3
Price:20 000 000 CZK


The administrative building of the company Milos is located in the area of the former Roudnice machine and foundry works. The building was constructed in 1998 alongside the production hall as its administrative and social annex for the former machine works. At the time of its creation, the overall construction and technical condition were quite poor, which was unacceptable for the needs of the new owner. The renovation therefore focused on the restoration of the structural condition of the constructions and surface treatments, as well as on improving the architectural standard of the house. A great deal of care from the investor was dedicated to creating a quality working environment and facilities for the employees, which was evident not only in the building itself but also in the (currently being realized) landscaping solution with a playground and rest areas.
The architectural solution of the design tries to respect the characteristic atmosphere of the house and fulfill it in a way that corresponds to the current needs and expectations for office space standards and the representativeness of the new owner's company. It preserves and emphasizes the horizontal character of the building along with the regular window grid. It highlights the original three prominent entry canopies with color and glazed surfaces. The facade area is insulated with mineral wool and a panel cladding system from Cembrit, which is locally supplemented in some inter-window panels with a contact system of foam polystyrene and thin-layer pigmented plaster. The existing windows are replaced with windows featuring insulating double glazing, and the openings glazed with glass blocks are also replaced with windows of the same division. Furthermore, the entry points are modified, and the color and material of the facade's added “frame” are changed using metal cladding; the glass block wall on the ground floor is replaced with a glazed wall with doors.
The stairwell areas are replastered, and the supporting system of the prefabricated reinforced concrete skeleton is revealed by removing the original plaster and applying a new coarse cement render. The existing surfaces of the landings and arms are fitted with black terrazzo. The steel railings are replaced with new ones made of atypical lattice structures, and instead of partitions and solid doors separating the stairwell areas from the corridors, full-glass double doors made of safety glass are designed.
There is no fundamental change to the layout, only "relocation" of partitions – the proportions of some spaces are altered. A more significant change is made only in the restrooms, which are designed entirely anew. The most modifications take place on the third floor, where besides the layout changes, new skylights between offices are implemented, new surfaces are executed, elements of associated construction production are replaced, hollow installation floors are constructed, and installations are replaced and concealed.
The English translation is powered by AI tool. Switch to Czech to view the original text source.
1 comment
add comment
Subject
Author
Date
Rekonstrukce socialistických budov
Martin Švec
14.01.10 05:31
show all comments

more buildings from Atelier UM